Difference between revisions of "VB - April"

From WLCS
(Removing all content from page)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
<!--
 
== Thursday (4/30/09) ==
 
* Begin implementation of your VB program
 
  
== Friday - Tuesday (4/24/09 - 4/28/09) ==
 
* Begin designing your VB program
 
* Draw a sketch of the layout
 
** In your sketch, be sure to label and caption each component of your program
 
* Create a list of goals and requirements that your program must be able handle
 
** You should have about 5-6 major requirements
 
* Give each of your requirements a deadline from now until the end of May
 
* Turn in your layout and your requirements list
 
 
== Monday - Wednesday (4/20/09 - 4/22/09) ==
 
* Engineering Design Review
 
** Problem Analysis
 
** Requirements
 
** Design
 
** Implementation
 
** Testing
 
** Evaluation
 
* Famous engineering problems
 
** How do we cross a body of water?
 
** How do we travel long distances?
 
** How do we fit a lot of people in a particular area?
 
** How do we power electronic devices?
 
* Think about and research a particular problem that you would like to solve
 
* Example problems for you
 
** Studying for a math / science exam
 
** Keeping track of movies / DVDs
 
** After-school work-related problems (e.g. inventory at CVS)
 
* By the end of today, turn in your problem analysis
 
** Statement of the problem
 
** Describe why/how it is a problem
 
** Describe how the problem has been addressed/solved in the past or today
 
** State who the end-users will be
 
** DO NOT DISCUSS YOUR SOLUTION
 
 
== Tuesday - Thursday (4/14/09 - 4/16/09) ==
 
* Rise of the Video Game: Part 3
 
 
== Archives ==
 
* [[VB - March]]
 
* [[VB - February]]
 
* [[VB - January]]
 
* [[VB - December]]
 
* [[VB - November]]
 
* [[VB - October]]
 
* [[VB - September]]
 
-->
 

Latest revision as of 12:17, 22 October 2009