Difference between revisions of "Matthew Pearson-Beck"

From WLCS
(2nd Quarter)
(2nd Quarter)
Line 42: Line 42:
  
 
== 2nd Quarter ==
 
== 2nd Quarter ==
<size=1>1. Week 1 Work
+
1. Week 1 Work
 
DUE:11/15
 
DUE:11/15
 
2. Week 2 Work
 
2. Week 2 Work
Line 71: Line 71:
 
DUE:1/10
 
DUE:1/10
 
15. Week 15 Work
 
15. Week 15 Work
DUE:1/14</size>
+
DUE:1/14
  
 
== 3rd Quarter ==
 
== 3rd Quarter ==
 
== 4th Quarter ==
 
== 4th Quarter ==

Revision as of 16:46, 8 November 2010

1st Quarter

Description
Create a class in Java that diagrams the formation and structure of Nodes, as they are created. Used to help introduce Nodes to students learning Java.

Resources
http://zetcode.com/tutorials/java2dtutorial/
http://www.sourcecodesworld.com/articles/java/java-data-structures/Nodes.asp
http://www.vias.org/javacourse/chap14_02.html

Goal List

  1. Research in detail the structure of nodes in Java.          
         DUE: 9/17
         DONE
  2. Complete 2D Graphics Tutorial.
         DUE: 9/27
         DONE
  3. Finish research, in its entirety, to make it possible to graphically represent nodes.
         DUE: 10/1
         DONE
  4. Graphically represent a single empty node.
         DUE: 10/5
         DONE
  5. Graphically link together empty nodes.
         DUE: 10/12
         DONE
  6. Control the layout of nodes based on the dimensions of the window they are in.
         DUE: 10/14
         DONE
  7. Graphically link together a set of empty nodes within the bounds of the window.
         DUE: 10/18
         DONE
  8. Graphically display the information a node contains.
         DUE: 10/22
         DONE
  9. Graphically display a given set of nodes, including the data they contain, inside the bounds of the window.
         DUE: 10/28
         DONE
 10. Organize all methods into a file that can be used to illustrate how nodes work. This file can be used by any student as they create their own nodes.
         DUE: 11/1
         DONE

2nd Quarter

1. Week 1 Work DUE:11/15 2. Week 2 Work DUE:11/19 3. Week 3 Work DUE:11/23 4. Week 4 Work DUE:11/30 5. Week 5 Work DUE:11/30 6. Week 6 Work DUE:11/30 7. Week 7 Work DUE:12/6 8. Week 8 Work DUE:12/10 9. Week 9 Work DUE:12/16 10. Week 10 Work DUE:12/22 11. Week 11 Work DUE:1/4 12. Week 12 Work DUE:1/4 13. Week 13 Work DUE:1/4 14. Week 14 Work DUE:1/10 15. Week 15 Work DUE:1/14

3rd Quarter

4th Quarter