Difference between revisions of "IBCS2 - March"

From WLCS
(Blanked the page)
 
Line 1: Line 1:
== Thursday (3/25/10) ==
 
* Introduction to Computer Architecture
 
** [[Media:IntroCompArch.ppt]]
 
* Quiz on Tuesday (4/6/10)
 
** [[Media:BooleanLogic.ppt]]
 
** [[Media:SimplifyingBooleanExpressions.ppt]]
 
** [[Media:LogicGates.ppt]]
 
** [[Media:DLD.ppt]]
 
* Bonus quiz on Computer Architecture on Tuesday (4/6/10)
 
  
== Tuesday (3/23/10) ==
 
'''Warmup:'''
 
* Please complete the following [https://spreadsheets.google.com/viewform?formkey=dHJQN2JlTE5BUUlNazQyMExoNGpmVmc6MA survey]
 
 
'''Agenda:'''
 
* Turn in completed dossiers
 
** Fill out IB coversheets (front and back)
 
** Fill out Mr. Bui's checklist (front and back)
 
** Binderclips for all
 
 
== Monday - Friday (3/15/10 - 3/19/10) ==
 
* Dossier - Conclusion due today
 
* Dossier - User Manual (User Documentation) due Friday (3/19/10)
 
* COMPLETED Dossier due next Tuesday (3/23/10)
 
 
== Tuesday - Thursday (3/9/10 - 3/11/10) ==
 
'''Warmup:'''
 
* An automated robot is used to cut shapes from steel sheets. If the robot's cutting blade becomes both hot and blunt the robot must stop so that the blade can cool and be resharpened. Sensors S1 (hot state) and S2 (blunt state) are attached to the blade to detect these states. Water from a container is used to keep the blade cool during cutting. If the water level falls below a certain point a sensor S3 detects this state and the robot stops irrespective of the other states. A logic circuit is required to control the robot so that it stops cutting when the appropriate states occur.
 
* Create the Boolean table that represents the above logic
 
 
'''Agenda:'''
 
* Turn in Dossier - Test Output
 
* Complete Dossiers!...NOW
 
* Dossier - Conclusion due Monday (3/15/10)
 
** [[Media:CriterionB3_conclusion.doc]]
 
 
== Friday (3/5/10) ==
 
* Work on your dossiers like crazy.
 
* ALL screenshots with captions are due next Tuesday (3/9/10)
 
** [[Media:CriterionB3_testOutput.doc]]
 
 
== Wednesday (3/3/10) ==
 
'''Warmup:'''
 
* Gate diagrams
 
 
'''Agenda:'''
 
* What the heck is a transistor?
 
* Handling Errors with try & catch
 
** [[Media:TryCatchDemo.java]]
 
* ALL screenshots with captions are due next Tuesday (3/9/10)
 
** [[Media:CriterionB3_testOutput.doc]]
 
 
== Monday (3/1/10) ==
 
'''Warmup:'''
 
* Draw the gate diagram for Z = A+B*C
 
* Draw the gate diagram for Z = AB + B'C
 
* Draw the gate diagram for Z = (A+B)'C
 
 
'''Agenda:'''
 
* Turn in your Success of Program
 
* Introduction to Logic Gates
 
* ALL screenshots with captions are due next Tuesday (3/9/10)
 
** [[Media:CriterionB3_testOutput.doc]]
 
 
== Archives ==
 
* [[IBCS2 - May]]
 
* [[IBCS2 - April]]
 
* [[IBCS2 - March]]
 
* [[IBCS2 - February]]
 
* [[IBCS2 - January]]
 
* [[IBCS2 - December]]
 
* [[IBCS2 - November]]
 
* [[IBCS2 - October]]
 
* [[IBCS2 - September]]
 

Latest revision as of 16:26, 3 September 2010